Seismic Update Grant
Seismic retrofit work has stopped, pending some remodel work. Remaining work that needs to be done for the seismic project, primarily, relates to finish work, replacement of fixtures, sealing up walls and paint. We're in the final push to the finish line!
Seismic Retrofit Project Schedule - Draft
Preliminary Design Concept Sketches
CMGC RFP - Due Date December 23, 2015
RFP - CMGC Seismic Retrofit Addendum
This is the paperwork for the Seismic Upgrade Proposal also included are notes from the pre-proposal meeting.
Seismic RFP Pre-Proposal Meeting
RFP Architectural Services Final
Included in the documents below are the blueprints and plans for Station 201 original construction from 1975 and the Annex addition in 2006.
201 Floor Plans, Cross section, Framing
201 Apparatus Room and East Wing